SOI II Structural Steel and Auditorium Retaining Wall

Structural steel installation continues; installation has advanced to Area “C”. Except for the Performing Arts Center(PAC), all of the concrete slabs have been poured. Form work for the retaining wall of the PAC auditorium is being installed. Metal stud framing , electrical conduit, Duct work, and masonry are being installed,