All of the structural steel has been erected. Metal studs and drywall are being installed. Paint is being installed.The mechanical, electrical, and plumbing, are being installed.
All of the structural steel has been erected. Metal studs and drywall are being installed. Paint is being installed.The mechanical, electrical, and plumbing, are being installed.