SOI II Progress, January 2020

All of the structural steel has been erected. Metal studs and drywall are being installed. Paint is being installed.The mechanical, electrical, and plumbing, are being installed.

SOI II Structural Steel and Auditorium Retaining Wall

Structural steel installation continues; installation has advanced to Area “C”. Except for the Performing Arts Center(PAC), all of the concrete slabs have been poured. Form work for the retaining wall of the PAC auditorium is being installed. Metal stud framing , electrical conduit, Duct work, and masonry are being installed,